October 1 - 15, 2002 - Planning
The planning phase will involve gathering information
to shape the requirements of the IA and determine the
context in which the IA is developed. To gather the
necessary information, we will interview primary stakeholders
(ATI Director and Webmaster) and end users, develop
user scenarios, study website usage, review design of
the current website and legal and business policies.
To support an effective design we will also study other
web sites and commercial web sites to develop benchmarks
for the new web site. Additionally, we will inventory
the content of the current site.
1) Meet with ATI to identify site goals and target
users
2) Develop Proposal and present to ATI
3) Create current Site map
4) Conduct Preliminary evaluation of the current Site
5) Write user scenarios
6) Track user scenario navigation paths
7) Evaluate comparable web sites for benchmarking
8) Conduct content audit
Oct. 16 - 31, 2002 – Analysis
As information is gathered, we will begin a detailed
analysis. The analysis will yield the requirements for
the architecture and will reflect the users’ expectations
and goals for the web site. This includes developing
the website mission, a user oriented taxonomy to categorize
information in the website, and structuring the content
based on the taxonomy.
9) Develop navigation and information architecture
based on scenarios and content
10) Revise Site map
Nov. 1 - 15, 2002 – Design
The architecture for the website will be constructed using
the detailed requirements, content, and user analysis
derived in the Planning and Analysis phases. The architecture
and navigation scheme will be based on the user oriented
taxonomy and content matrix. A wireframe of pages will
be developed to represent the key pages of the web site.
11) Design wireframes for key pages, focusing
on use of templates
12) Develop Site Style Guide
Nov. 16 -30 , 2002 – Construction,
Verification and Deployment
The style guide will be written and the prototypes implemented.
We will perform user testing of prototypes and refine
the prototypes based on test results.
13) Implement low-fi prototypes
14) Refine prototypes through usability testing
Dec. 1, 2002 - Final Walkthrough Review
We will meet with ATI to assure project goals have been
met. In addition to the design, recommendations will
be made for content maintenance and web site expansion
and extension.
Dec. 3, 2002 - Group Project Presentations/Post-Mortem
Report
We will present our project to the class and to ATI,
and we will provide a post-mortem report that reviews
what we felt went well with the project, as well as
areas that could be improved.